B.P. Banerjee, J.@mdashThis is an application under Article 226 of the Constitution of India, the Petitioner had challenged an order of black-listing by which all business dealing by and between the Petitioner, M/s. Shanker Engineering and Trading Co. Calcutta, and Central Coalfields Ltd. had been suspended by Inspector-General and Chief Vigilance Officer of Central Coalfield Ltd. by orders dated May 15 and June 4 1986, as well as filing of a F.I.R. alleging an offence under Sections 120B and 420 of the Indian Penal Code against the Petitioner by the Inspector, C.B.I. Ranchi, and an investigation initiated on the basis of the said F.I.R.
2. The facts of this case, in short, are that the Petitioner is carrying on the business in electrical, mechanical and fabrication engineers, having its office at No. 2, Ganesh Chandra Avenue, 5th to 8th floor, Calcutta, and workshop at 121, J.N. Mukherji Road, Ghusuri, Howrah, in the State of West Bengal. That in pursuance of an advertisement inviting tenders for supply of 4 steel balls of the specification of 80, 60 and 40 mm. published on May 19, 1984, the Petitioner submitted tender for supply of the said items and that, accordingly, to the general terms and conditions of the tender the Petitioner was required to quote firm prices on F.O.R. destination basis. The said general terms and conditions further stipulated that the earnest money of Rs. 2000 had to be deposited along with the offer by demand draft in favor of the Central Coalfield Ltd., Ranchi, on State Bank of India, Ranchi Branch. Pursuant to the sard notice inviting tender the Petitioner submitted a tender and that the Petitioner''s tender was accepted on the basis of his quotation on May 22, 1985, for supply of the said items of forged steel balls as specified in the said tender. The said offer made by the Petitioner on May 22, 1985, was, however, accepted by the Central Coalfields Limited and that your Petitioner was informed that such acceptance by the senior Purchase Officer, of the Central Coalfield Ltd., Darbhanga House, Ranchi. In view of such acceptance of offer given by the Petitioner under quotation dated May 22, 1985, the Petitioner, however, remained liable for repair or replacement of the articles supplied during the period of one year from the date of supply in case of manufacturing defects. It is stated that for the purpose of effecting supply of forged steel balls the Petitioner got the same done through another firm and that before supply of the same the Petitioner got necessary certificate of analysis from the Industrial Quality Controller, a Government registered Industrial Testing and Analytical Laboratory. As the Central Coalfield Ltd. was in urgent need of supply of forged steel balls wrote a letter to M/s. Choudhury Carrying Corporation, the transport agent of the Central Coalfields Ltd. to take delivery of one truck of balls from the Petitioner under reference No. KTW dated November 1, 1985. In pursuance of the said letter dated November 1, 1985, the said M/s. Choudhury Carrying Corporation took delivery of 100 packages of forged steel balls from the Petitioner under consignment note dated November 8, 1985, pertaining to consigner''s challan No. HO/23/85-86 dated November 8, 1985 and on November 9, 1985, the Petitioner again gave a guarantee certificate in respect of the said manufactured goods and once again guaranteed that in case of any manufacturing defects during, the period of one year, the Petitioner would replace the same free of cost, and in respect of the said supply so made by the Petitioner under challan dated November 8, 1985, the Petitioner raised bill against the Project Officer, Central Coalfield Ltd., Kathara, Giridhi, on November 9, 1985, for a sum of Rs. 87,360. By the said bill it was categorically pointed out that the supply vis-a-vis the payment in regard thereto was subject to Calcutta jurisdiction. Again on October 3, 1985, the Petitioner was asked by the Coal India Ltd. to arrange for immediate supply of the balance quantity of forged steel balls against supply order dated October 11, 1985, under reference No. KTW/Steel. Ball/7170 dated December 3, 1985, issued by the Purchase Officer, Central Coalfield Ltd., Kathara Washeries. In reply to the said letter dated December 3, 1985, the Petitioner by letter dated December 9, 1985, informed the Project Officer, Central Coalfield Ltd., that already one truck load of balls had been dispatched and the balance quantity was under process of manufacturing and would be dispatched as soon as the same could be made ready. Thereafter on December 16, 1985, the Senior Purchase Officer, Central Coalfield Ltd., by his letter intimated the Petitioner about certain in the order dated October 11, 1985. By the said letter dated December 16, 1985, the amendments to the material specification and the mode of dispatch were made on January 3, 1986. 180 bags of forged steel balls were dispatched to the Purchase Officer, Jatgara Washeries of the Central Coalfield Ltd. and also submitted a guarantee certificate dated January 3, 1986, that the Petitioner would replace the articles free of cost in case of any manufacturing defects within the guarantee period of one year from the date of supply on the same date. The Petitioner submitted a bill for Rs. 78,936 to the Project Officer, Central Coalfield Ltd. Kathara Washeries, Giridih, Bihar. In the said bill also it was specifically mentioned that the same was subject to Calcutta jurisdiction. In view of the amendments brought about by the letter dated December 16, 1985, the Petitioner requested the Deputy. Materials Manager (P), Centeral Coalfield Ltd. for extension of delivery period so that no liquidated damages were imposed upon the Petitioner under letter dated January 17, 1986. The Petitioner again by letter dated April 4, 1986, requested the Deputy Materials Manager (P)(VI), Central Coalfield Ltd. for extending the delivery period up to June 15, 1986, without imposing any liquidated damages. The Project Officer by his telegram dated March 26, 1986, asked the Petitioner to effect immediate dispatch of the balance quantity of steel balls against supply order dated October 11. It is the case of the Petitioner that while the Petitioner was persistently asked to effect delivery of forged steel balls by installment, the Petitioner never informed that the goods already supplied were defective or were not in accordance with the standard tender specification. Again on April 6, 1986, the Project Officer, Kathara Washeries, informed the Petitioner that in view of the urgency one Mr. B.K. Sinha of Kathara Washeries was deputed for dispatch of materials through the authorized transporter against supply order dated October 11, 1985. The Petitioner was further requested to extend all help to the said Shri Sinha by letter dated April 6, 1986. It is stated that the Petitioner came to learn on'' or about April 7, 1986, by a wireless message issued by the Project Officer, Kathara Washeries, under memo No. KTW/3660 addressed to the Chief Central Menager (WS), Central Coalfield Ltd., by the said wireless message extension of time as prayed for by the Petitioner, was requested to be given by the concerned Project Officer. By letter dated April 8, 1986, the Petitioner was, however, informed that the recommendation of the Petitioner for extension of the delivery period had been processed through Central Coalfield Ltd., Purchase Department; as necessary in that regard. On April 20, 1986, the Petitioner was further informed by letter KTW/525/3886 by the Project Officer, Kathara Washeries, requested the Petitioner to arrange for further dispatch of forged steel balls to lorry No. BRY 2394. By the letter dated April 16, 1986, issued by the Assistant Materials Manager (P), Central Coalfield Ltd., the Petitioner was informed that the delivery period of supply order covered by order dated October 11, 1986, was previously extended up to May 30, 1986, and pursuant to the said letter dated April 20, 1986, the Petitioner supplied the balance quantity of forged steel balls under challan No. HO/02/86-87 dated April 25, 1986, against supply order dated October 11, 1985. On April 26, 1986, the Petitioner was also given a guarantee certificate in respect of supply effected under challan dated April 25, 1986, inter alia, guaranteeing that the case of any manufacturing defects the Petitioner would replace the same within a guaranteed period from the date of supply and also submit a bill for Rs. 61,152. Even though the supply of the forged steel balls were made by installments under the said supply order, at no point of time there had been any objection against the quality and quantity of the article supplied by the Petitioner and that without intimating any reason and/or ground the Petitioner was served with an order by the Deputy Materials Manager (P) dated June 3, 1986, stated that in view of the analyses in your supplies to Central Coalfield Ltd. your registration is hereby withdrawn and that this was followed up by a circular dated May 15, 1986, under No. vig./Black list/Shankar Engg. and Trading Co./86(34)/690 wherein it was stated that during an enquiry it has been prima facie revealed that M/s. Shankar Engg. and Trading Co. Calcutta, has supplied sub-standard steel balls for use in one of the Washeries of C.C.L. While the complete enquiry is in progress, C.M.D., C.C.L. has taken a decision to suspend business dealings of C.C.L. with M/s. Shankar Engineering and Trading Co., Calcutta, with immediate effect. General Managers of all areas and Project Officers of all Washeries are requested to ensure that all business dealings with M/s. Shankar Engineering and Trading Company, Calcutta, are suspended forthwith. This was followed up by another circular No. vig/Black List/Shankar Engg. and Trading Co./86(34)776 dated June 4, 1986, wherein it was stated that in modification of earlier circular No. vig/Black-list/Shankar Engg. and Trading Co./86(34)/690 dated 15.5.86 it is brought to the notice of all that business dealing with M/s. Shankar Engineering and Trading Company, Calcutta, regarding supply of steel balls will remain suspended. Other business dealings may continue.
It is stated that after black-listing the Petitioner, the office premises of the Petitioner at No. 2, Ganesh Chandra Avenue, Calcutta, and the workshop at No. 121, J.N. Mukherji Road, Ghusuri, Howrah were searched by the officers of the C.B.I., Ranchi and Calcutta, on October 21, 1986. It was stated that in course of such search nothing incriminating could be found excepting a file containing a test certificate and factory copy of the test report and certain bills. Thereafter, one Shri D.B. Singh, Inspector of C.B.I., Ranchi, lodged a F.I.R. on August 29, 1986, alleging an offence Under Sections 120B/420 of the Indian Penal Code against the Petitioner; In the said F.I.R. it was stated as follows: On receipt of an information by the IG/CVO/CCL, Darbhanga House, Ranchi, to effect that M/s. Shankar Engineering and Trading Co. were supplying sub-standard steel balls to the Washery Department against the purchase order No. Wary/Pur/1/1263/36/6072, dated October 11, 1985, worth Rs. 2,28,650, the C.V.O. got collected the samples from the supplies made by the first against aforesaid purchase order. The physical as well as chemical tests conducted by the National Insurance of Foundry and Forge Technology (NIFFT) a specialized Government agency in testing forged steel items revealed that M/s. Shankar Engineering and Trading Co. did not supply the forged steel balls as specified in the purchase order, instead the firm had supplied cast steel balls which are not suitable for the job as well as their cost of production is also lower by 15 to 20 % to that of forged steel balls. M/s. Shankar Engineering and Trading Co. in conspiracy with Shri R.P. Upadhyaya, Sr. Executive Engineer dishonestly or fraudulently induced the authorities of C.C.I to make payment to M/s. Shankar Engineering on the basis of false inspection certificate. In this connection Shri R.P. Upadhyaya had accepted the balls supplied by M/s. Shankar Engineering and Trading Co on the basis of his visual inspection as well as on the basis of test certificate No. 26953 enclosed by the firm purportedly issued by M/s. Industrial Quality Controllers, Calcutta, on November 14, 1985.
3. Shri R.P. Upadhyaya in conspiracy with the aforesaid firm again accepted another lot against the same test certificate bearing No. 26953 issued by M/s. Industrial Quality Controllers, Calcutta, in which some alternations has been made to impress upon the authorities of C.C.L. that the 40 mm. size balls were also got tested whereas the original certificate furnished by the firm clearly indicates that 40 mm. balls were never tested by M/s. Industrial Quality Controllers. Although Shri R.P. Upadhyaya had full knowledge of the alternation, even then he passed the substandard steel balls supplied by M/s. Shankar Engineering and Trading Co., and hence the payment was made to the party. Besides, it was possible to identify the cast steel balls to those of forged steel ball on the visual inspection only as the cast steel balls contains ridge marks whereas forged steel balls do not have these ridge marks. Shri R.P. Upadhyaya had accepted a total quality of 10 M.T. substandard steel balls costing Rs. 1,60,000 approx. which have been paid to the firm again against sub-standard supply made by him.
4. The above facts disclose a prima facie case against Shri R.P. Upadhyaya and M/s. Shankar Engineering and Trading Co., Calcutta, u/s 120B/420 of Indian Penal Code and investigation is taken up.
5. On behalf of the Respondents, Mr. Samar Banerjee, learned Counsel, raised preliminary point with regard to the maintainability of the writ application before this Court. According to him, the cause of action had arisen outside the jurisdiction of this Court and, as such, this Court cannot entertain the writ application and cannot grant any relief. It was submitted that the orders were placed from Bihar on a Calcutta party and that the order of black-listing was also issued by an officer who was posted at Bihar and, as such, the cause of action could not be said to have been arisen within the jurisdiction of this Court. It was further submitted that the F.I.R. was also submitted before the Delhi Special Police establishment Rachi Branch by an Inspector of C.B.I, Ranchi and, as such, this Court have no territorial jurisdiction over this matter.
6. Mr. Samaraditya Pal, learned Counsel appearing on behalf of the Petitioner, contended that in any event a part of cause of action had arisen within the jurisdiction of this Court inasmuch as the office and the workshop of the Petitioner are situated within the jurisdiction of this Court, and further, pursuant to the acceptance of tender, the order Was placed, on the Petitioner whose office was situated at Calcutta and that goods were supplied by the Petitioner who was within the jurisdiction of this Court add pointed out that when fie goods were supplied and the bills Were issued it was made specifically clear that the same was ''subject to Calcutta jurisdiction'', and this was printed on all the bills and that at no point of time the Respondents have disputed this point that this was not subjected to the Calcutta jurisdiction. It was further submitted by Mr. Pal that in the field of the contract the parties had liberty to agree to jurisdiction of any Court and in this particular case where the parties had agreed that for litigation purpose the same would be subject to Calcutta jurisdiction and accordingly this Court has jurisdiction. It was further submitted that black-listing was made in respect of the jurisdiction of this Court and the orders were communicated to a party who was within the jurisdiction of this Court and it was further submitted by Mr. Pal relying upon a Division Bench judgment of this Court in the case of
7. A cause of action means every fact, which are traversed, it would be necessary for the Petitioner to prove in order to support his right to a judgment of the Court. In other words, it is a bundle of fact which is taken that the law applicable to them gives the Petitioner a right to relief against the Respondents, it must also include some act done by the Respondents since in the absence of such an act no cause of action can possibly arise. A cause of action arose at any of the following places, i.e. (a) the place where the contract was made; (b) the place where the party performs or performance would be completed; (c) the place where any performance of the contract in money in which the suit relates was expressly or impliedly payable. Of course, parties can agree to the jurisdiction and, in the instant case, all the bills that were raised by the Petitioner, it was printed that this was subject to jurisdiction of Calcutta and that in the absence of any protest and objection raised on behalf of the Respondents by any of the correspondences it must be held that by implication it must be accepted that the Respondents have accepted that any dispute relating to the same could be decided by any Court in Calcutta. The goods were supplied from Calcutta and the orders were placed at Calcutta by the Respondents. The goods were supplied from Calcutta office and the money was payable at the Calcutta office. Further, on the basis of the F.I.R. the search and seizure took place within the jurisdiction of this Court.
8. The Supreme Court in the case of
9. The next question is whether the black-listing could be made without giving any notice and/or opportunity of being heard to the Petitioner concerned is now concluded by several decisions of the Supreme Court. In
Hence, a person must be given an opportunity of hearing before his name is put on the-black list. This case of the Supreme Court was followed in a large number of cases and it is not necessary to multiply the cases on this point inasmuch as this principle is now well-settled.
10. In this case the Petitioner under a contract had supplied certain materials with a specific guarantee in writing that in case it is found that the goods in question do not confirm with the quantity or quality within the guarantee period of a period of one year from the date of supply/arrival on site, in case of any manufacturing defect is found within the aforesaid period of one year the Petitioner would be liable to replace the same free of cost. But in the instant case, even though goods have been dispatched on a number of occasions by installments but no exception was taken by the Respondents regarding the quality of the goods and/or whether the goods were sub-standard or not. If it was found within the period of one year that the goods were defective, in that event under the guarantee the Petitioner was bound to replace the goods which were found to be the goods not according to proper standard and quality. The registration of the Petitioner with the Central Coalfield Ltd. as suppliers were cancelled by an order dated June 3, 1986, without disclosing any reasons and/or grounds and/or without giving any hearing and/or opportunity of being heard. Copy of this order was forwarded and circulated to several such officers of the Central Coalfield Ltd. situated in Calcutta, Dhanbad and Ranchi. The Inspector-General and Chief Vigilance Officer of Eastern Coalfield Ltd., Ranchi, issued a circular whereby it was alleged that prima facie it revealed that the Petitioner had supplied sub-standard goods and that, accordingly a decision was taken suspending the business dealing with the Petitioner. The Respondents, Central Coalfield Ltd., are admittedly an instrumentality of the State within the meaning of Article 12 of the Constitution. As an authority under Article 12 it does not appear to be neither fair nor proper to take such decision without raising any objection as to the quality and quantity of the goods supplied at any point of time and that, in any event, such an order could not have been passed without giving the Petitioner any opportunity of being heard in view of the certificate of guarantee submitted by the Petitioner it was drawn to the notice of the Petitioner that the goods did not confirm with the specification as per the order, in that event the Petitioner could have replaced the materials and at least the Petitioner must be given an opportunity to show that he has supplied sub-standard forged steel balls of the quantity of the specific field of the contract.
11. The old view of the Supreme Court with regard to the power of the writ petition in so far as the contractual obligations are concerned has been departed from. The view of the Supreme Court has been changed and there has been a massive expression of judicial review by the writ Court in respect of contractual matters are concerned given in case of cancellation of the please by the Government, it is open to the writ Court to examine the decision-making process in a case where the lease was cancelled and the lessee had claimed to have made much investment in the land in question and it was held that the statutory authority should afford a personal hearing to the lessee after the issue of a show-cause notice setting out the precise grounds: see
12. In
13. Now with regard to the F.I.R. is concerned on perusal of the same it is crystal clear that the allegations was at best that the Petitioner has supplied goods sub-standard steel balls or, in other words, the steel balls that were supplied were not up to the specification. The goods were supplied Under a contract and when the party bas undertaken by giving a guarantee that event within a period of 12 months from the date of supply the goods if the goods were found to be not confirming with the quantity or the quality, the Petitioner will be liable to take it back and replace the same according to proper specification. In the instant case, it was alleged in the F.I.R. that the Petitioner had committed an offence of cheating as defined u/s 420 of the Indian Penal Code:
Whoever cheats and thereby dishonestly induces the person deceived to deliver any property to any person, or to make, alter or destroy the whole or any part of a valuable security, or anything which is signed or sealed, and which is capable of being converted into a valuable security, shall be punished with imprisonment of either description for a term which may extend to seven years and shall also be liable to fine.
14. On reading the contents of the F.I.R. and the provision of Section 420 of the Indian Penal Code it does not appear that the Petitioner has committed any offence u/s 420 of the Indian Penal Code. On the basis of the facts disclosed in the F.I.R. at best it can be said that the Petitioner had supplied goods not according to the specification but at no point of time it was pointed out that the goods were not according to the specification and no opportunity was given to the Petitioner to replace the goods which according to the guarantee as furnished by the Petitioner, the Petitioner was liable to replace. The supply was governed by a contract and, according to the contract, it was for the Respondents to check the material and to reject the material if it is found that, the goods in question did not conform with the quantity or quality as specified, but in the instant case it was not so; repeatedly the Petitioner was asked to go on supplying the goods as the Respondents were in urgent need of the same. It cannot be said that supplying of sub-standard steel balls amounts to an offence u/s 420 of the Indian Penal Code inasmuch as it is a mere civil dispute and the essential ingredients of Section 420 of the Indian Penal Code are wholly absent in the instant case.
15. On behalf of the Petitioner reliance was placed to the decision of the Supreme Court in the case of
(a) Where the allegations made in the First Information Report or the complaint, even if they are taken at their face value and accepted in their entirety do not prima facie constitute any offence or make out a case against the accused.
(b) Where the allegations in the F.I.R. and other materials, if any, accompanying the F.I.R. do not disclose a cognizable offence, justifying an investigation by Police Officer u/s 156(1) of the Code except under an order of a Magistrate within the purview of Section 155(2) of the Code.
(c) Where the incontroverted allegations made in the F.I.R. or complaint and the evidence collected in support of the same do not disclose the commission of any offence and make out a case against the accused.
(d) Where the allegations in the F.I.R. do not constitute a Cognizable offence but constitute only a non-cognizable offence, no investigation is permitted by a Police Officer without an order of a Magistrate as contemplated u/s 155(2) of the Code.
(e) Where the allegations made in the F.I.R. or complaints are so absurd and inherently improbable on the basis of which no prudent person can ever reach a just conclusion that there is sufficient ground for proceeding against the accused.
(f) Where there is an express legal bar engrafted in any of the provisions of the Code or the concerned Act (under which a criminal proceeding is instituted) to the institution and continuance of the proceedings and/or where there is a specific provision in the Code or the concerned Act, providing efficacious redress for grievance of the aggrieved party.
(g) Where a criminal proceeding is manifestly attended with mala fide and/or where the proceeding is maliciously instituted with an ulterior motive for wreaking vengeance on the accused and with a view to spite him due to private and personal grudge.
16. This is a clear case where all the allegations made in the F.I.R. even they are taken at their face value and accepted in its entirety do not prima facie constitute any offence or make out a case against the accused and the Petitioners and further the allegations in the F.I.R. did not constitute any cognizable offence but constitute certain civil offences, if any, for committing breach of contract one may be liable for damages but on the basis of this fact disclosed in the F.I.R. no investigation could be continued and consequently all actions taken on the basis of the said F.I.R. are all on the face of it illegal. Accordingly, the said F.I.R. dated August 20, 1986, which is Annex. ''X'' to the petition including the investigation and/or any case started thereon, stands quashed. The order of suspension of business and the black-listing made by the order dated June 3, 1986, issued by the Deputy Material Manager (P), Central Coalfield Ltd., the order of black-listing issued by the Inspector-General/Chief Vigilance Officer of Central Coalfield Ltd. dated May 15, 1986, and June 4, 1986, also stands quashed. This order is without prejudice to the rights of the Respondents to pass a fresh order of black-listing only upon disclosure of reason and only after issuing a show-cause notice and giving a hearing to the Petitioner. The writ petition succeeds to the extent indicated above. There will be no order as to costs. The learned Advocate appearing for the Respondents pray for stay of operation of the operative part of the judgment for four weeks from date.
17. Such prayer is granted.
18. Let all parties to act on the Xerox copy of the judgment to be signed by the Court Officer on the usual undertaking.
Application succeeds.