M/S. Nizam�s Restaurant Private Limited & Anr. Vs Kolkata Municipal Corporation & Ors.

Calcutta High Court (Appellete Side) 21 Dec 2023 W.P.A. No. 1930 Of 2013 (2023) 12 CAL CK 0080
Bench: Single Bench
Result Published
Acts Referenced

Judgement Snapshot

Case Number

W.P.A. No. 1930 Of 2013

Hon'ble Bench

Saugata Bhattacharyya, J

Advocates

Sakti Nath Mukherjee, Achintya Banerjee, R.N. Chakraborty, Tanusree Das, Ashoke Kumar Banerjee, Biswajit Mukherjee, Swapan Kumar Debnath, Sourav Chaudhuri

Final Decision

Disposed Of

Acts Referred
  • Constitution Of India, 1950 - Article 14, 265
  • Kolkata Municipal Corporation Act, 1980 - Section 131, 131(2), 131(2)(e), 131(3), 170, 179(2), 307, 426, 427, 430, 430(a)(i), 432, 432(1)(c), 573
  • Indian Easements Act, 1882 - Section 52

Judgement Text

Translate:

1. Writ petition is directed against two demand notices both were issued by the Superintendent, S.S. Hogg Market one is dated 14th January, 2011 and another is dated 21st November, 2011 whereby M/s. Nizam’s Restaurant Private Limited was first asked to pay Rs.2,79,02,453/- and subsequently the reduced amount of Rs.2,10,56,342/- towards various charges as indicated in the said two impugned demand notices. The decision of the Municipal Commissioner, Kolkata Municipal Corporation which has been taken pursuant to the order passed by a co-ordinate Bench on writ petition being WPA 22459 of 2011 on 31st January, 2012 which is ‘Annexure P-9’ to the writ petition has also been questioned in the writ petition which supports the demand lodged on behalf of the Kolkata Municipal Corporation (hereinafter referred to as “KMC”) vide aforesaid two demand notices. However, it needs to be stated herein on re-examination of the quantum of demand as raised vide notice dated 21st November, 2011, same was subsequently reduced to Rs.2,05,81,725/- which the petitioners were asked to pay to the KMC.

2. The writ petitioners are represented by Mr. Sakti Nath Mukherjee, learned senior advocate and during course of his submission first the meaning of “stallage” was narrated before this Court in reference to the meaning attributed to the word “stallage” in several dictionaries and it was demonstrated before this Court that the word “stallage” connotes onetime payment which should not be construed as continuous liability on the person who is required to pay stallage which is different from rent since rent bears the meaning of continuous payment month by month. It has further been submitted on behalf of the writ petitioners that stall operators are not tenants but licensees and the same cannot be transferred. Original Recorded Permit Holder (hereinafter referred to as “RPH”) was Sk. Nizam who died on 8th April, 1972 leaving behind four daughters, his widow and son Irshad Alam. After the death of original RPH due to financial stringencies the restaurant had to be closed down and thereafter with the assistance of Shelter Projects Limited the business of restaurant was re-started on formation of a company namely M/s. Nizam’s Restaurant Private Limited. After induction of Shelter Projects Private Ltd. in the restaurant business and formation of the company as stated above an application was made before the KMC on 19th March, 2009 for change of name in respect of six stalls as a single unit since it has been contended on behalf of the petitioners that from the very beginning the restaurant was being operated as a single unit utilizing six stalls. Based on such application for change of name inducting the aforesaid third party the superintendent S.S. Hogg market issued impugned demand notices dated 14th January, 2011 and subsequently dated 21st November, 2011 demanding charges for mutation, regularization of excess area, stallage, amalgamation of stalls, penalty for amalgamation of stalls, charges for sub-floor areas, charges for excess area, penalty for encroachment and penalty for transferring the said unit of six stalls to M/s. Nizam’s Restaurant Private Limited without permission of KMC. It has already been stated above that though vide demand notice dated 21st November, 2011, Rs.2,10,56,342/- was demanded but on waiving amalgamation charge of six stalls into one unit on re-examination of such demand finally Rs.2,05,81,725/- was demanded from the petitioners.

3. The basis of making such demand by the KMC is primarily questioned by the petitioners on the count that calculation and imposition of such charges is without authority. While quantifying stallage charge unnecessarily multiplier was applied which has no legal sanctity. In reference to Section 573 of the Kolkata Municipal Corporation Act, 1980 (hereinafter referred to as the “said Act of 1980”) it has been contended that after the lapse of three years from the date on which the sum becomes due and payable the demand cannot be raised as it has been done in the present case by issuing aforesaid two impugned demand notices. Last of all according to the petitioners the demand lodged by the KMC against the petitioner is arbitrary and inadmissible in view of the relevant provisions of the said Act of 1980. Another plank of submission of the petitioners rests on Article 265 of the Constitution of India which provides no tax shall be levied or collected except by authority of law. According to the petitioners since the demand made by KMC is not backed by statutory provisions of the said Act of 1980 which makes such demand nugatory on the strength of Article 265.

4. It has been argued that since Sk. Nizam was RPH and original licensee which is not transferrable, no charge can be imposed for transfer of the said unit of six stalls first to Sk. Irshad Alam and subsequently to M/s. Nizam Restaurant Private Limited. It has also been submitted that stallage charge coupled with multiplier is also not permissible in terms of the relevant provisions of the said Act of 1980. In this regard reliance has been placed on Section 430 and Section 131 of the said Act of 1980. Section 430 provides the Municipal Commissioner may charge stallage, rent and fee as may from time to time be fixed by the corporation for the occupation or use of any stall, shop, stand, shade or pen in municipal market or municipal slaughter-house. According to the petitioners most of the charges imposed vide impugned demand notices cannot be construed as stallage, rent or fee therefore KMC cannot levy such charges unjustifiably upon the petitioners. In other words, KMC can only impose stallage, rent and fee under the relevant provisions of the said Act of 1980 that authorizes KMC to levy. While questioning the authority of KMC to impose charges as contained in aforesaid two impugned demand notices one well-known proposition of law has been referred by Mr. Mukherjee that natural person has the capacity to do all lawful things unless his capacity has been curtailed by some rule of law; it is equally a fundamental principle that in case of a statutory corporation, it is just the other way. The corporation has no power to do anything unless those powers are conferred on it by the statutes, which creates it (See: Manimuddin Bepari vs. Chairman of the Municipal Commissioner, Dacca, reported in 40 CWN 17). While laying stress on this principle the judgment reported in (2007)3 CHN (Asian Leather Limited & Another vs. Kolkata Municipal Corporation & Ors.) has been referred to on behalf of the petitioners. Borrowing inspiration from the said well-known principle of law it was argued that KMC cannot lay demand as reflected from the aforesaid two impugned notices beyond the ambit of Section 430 of the said Act of 1980.

5. At the same time attention by this Court has been drawn to Section 131 of the said Act of 1980 which deals with annual budget of the corporation whereby corporation has been authorized on or before 22nd day of March in each year to adopt for the ensuing year a budget estimate which shall be the estimate of the receipts and expenditure of the corporation to be received and incurred on account of municipal government of Kolkata. In reference to the aforesaid provisions as contained in Section 430 and Section 131 it has been argued that in budget that rate of stallage, rent or fee can be fixed but new head cannot be introduced which would make the KMC entitled to impose and demand different category of charges which have not been contemplated under Section 430(a)(i). In other words, charge or demand needs to be authorized by the statute under Section 430(a)(i) and the same can be validated under Section 131.

6. While demonstrating inadmissibility of the demand which has been termed as unreasonable in respect of utilization of sub-floor area by the petitioners it is contended that charge can be levied but the quantification must be reasonable. Extension of area at the instance of the petitioners as alleged by KMC which appears from the demand notices is disputed by the petitioners. Penalty which has been imposed against the petitioner is questioned on the ground that there is no provision to impose penalty as it has been done in the present case by the concerned authority of KMC which makes the impugned demand notices bad and untenable. According to the petitioner no application was made for amalgamation of six stalls into one since from the very beginning those six stalls were utilized as a single unit by the RPH, therefore KMC cannot impose amalgamation charge as it has been done in the present case.

7. Mr. Mukherjee, learned senior advocate has drawn attention of this Court to the averments made in paragraph 16 of the writ petition wherefrom it appears that though the restaurant of the petitioners was initially comprising of an area of 3484.25 sq. ft. but on measurement subsequently it was found that the restaurant covered the area of 5313 sq. ft. and according to the petitioner utilization of such excess area was approved by the Municipal Commissioner on 10th January, 2004. As per note dated 6th January, 2006 of the Joint Municipal Commissioner total demand towards arrear fees/charges that was quantified to the tune of Rs.24,00,000/- and the said amount was paid by the petitioners which should be construed as part of rehabilitation process in order to revive the old restaurant which remained closed for some time due to financial stringencies. According to the petitioners the arrear provident fund contribution had to be provided by the petitioners for the benefit of its staff amounting to Rs.58,00,000/- and retirement benefits were paid to the tune of Rs.19,44,600/- .Therefore it has been projected before this Court that petitioners not only paid Rs.24,00,000/- but in addition thereto for providing service benefits to the staff of the restaurant petitioners paid Rs.58,00,000/- + Rs.19,44,600 = Rs.77,44,600/- and the aforesaid huge amount spent by the petitioners is required to be considered as a step towards rehabilitation of the unit which remained closed. In respect of paragraph 12 of the affidavit-in-opposition used on behalf of KMC to the writ petition it has been urged that Rs.24,00,000/- was assessed by the KMC being the outstanding demand and since the same was duly paid, it constitutes implied approval of inducting Nizam’s Restaurant Private Limited in order to demonstrate that the proposal of inducting Nizam’s Restaurant Private Limited by the RPH for running restaurant business has been duly approved by the concerned authority of KMC. Paragraph 4(g) of affidavit-in-opposition and page 31 of the supplementary affidavit used on behalf of KMC have been relied upon. On perusal of paragraph 4(g) of the affidavit-in-opposition it appears that KMC decides to grant license in favour of M/s. Nizam’s Restaurant Private Ltd. subject to certain terms and conditions and payment in terms of demand notice. Whereas page 31 of the supplementary affidavit contains a letter dated 14th January, 2011 issued to the Director of M/s. Nizam’s Private Limited by Superintendent S.S. Hogg Market intimating that the mayor vide order dated 12th January, 2011 approved the prayer of the petitioners which was made by the petitioners on 29th March, 2009 seeking mutation based on the agreement dated 15th June, 2007, in favour of M/s. Nizam Restaurant Private Limited. It was submitted that as per letter dated 14th January, 2011 of superintendent S.S. Hogg Market and the averments made in paragraph 4(g) of the affidavit-in-opposition the concerned authority of KMC approved the application of the petitioner which was made in March, 2009. Therefore, after approval of such proposal of inducting M/s. Nizam’s Restaurant Private Limited being a new entity to run the restaurant which was previously being run by the RPH, charges cannot be levied which is not permissible under the relevant provisions of the statute. In this regard reliance has been placed on paragraph 11, 12, 13 and 14 of Asian Leather Ltd. & Anr – vs – Kolkata Municipal Corporation & Ors. reported in (2007)3 CHN, page - 476. It is contended based on the law laid down in Ahmedabad Urban Development Authority vs. Sharad Kumar Jayantikumar Pasawalla reported in AIR 1992 (SC), page – 2038, paragraph – 6, that tax and/or fee cannot be imposed by delegated authority based on implied authority; the provisions must be very specific and empowered such authority to impose tax/fee. Delegated authority must act strictly within the parameters of the authority delegated to it under the Act and it will not be proper to bring the theory of implied intent or the concept of incidental and ancillary power in the matter of exercise of fiscal power. According to the petitioner since Section 430 authorizes KMC to impose stallage, rent, fees the petitioners ought not to be saddled with levying of other charges or fees which have not been contemplated under Section 430 (a)(i).

8. It is also urged on behalf of the petitioners on the strength of Section 573 of the said Act of 1980 that any sum due to the corporation on account of any charge, cost, expenses, fee, rate or rent or on any other account under this Act or the rules or the regulations shall be recoverable from the person from whom such sum is due as if it were a property tax with a rider that no proceeding for recovery of any such sum under Section 573 shall be commenced after lapse of three years from the date on which such sum becomes due. Therefore, according to the petitioners demand of charge/fee for utilization of excess area as made by the KMC cannot be countenanced since for a long period the RPH has been utilizing said excess area and contemporaneously no proceeding was initiated for recovery of charge/fee for such use of excess area. On the aforesaid point of limitation reliance has been placed on the judgment of the Hon’ble Division Bench reported in (2018) 3 CHN 328 (Sahujain Charitable Society & Anr. vs. The Kolkata Municipal Corporation & Ors.) paragraphs 27 and 28.

9. It is submitted that only mutation and other mutation related charges can be levied but other charges which have been indicated in the aforesaid impugned demand notices ought not to have been levied on the petitioners while approving the proposal which was made on 19th March, 2009 on behalf of the petitioners. At the same time it is also contended that levying of charges including dues for mutation as applied on behalf of the petitioners must be reasonable and satisfy the test of Article of 14 of the Constitution of India. It has been specifically submitted on behalf of the petitioners that charges which have been levied including the mutation fee ought to be construed as tax upon placing reliance on the judgment of the Apex Court reported in (2005) 4 SCC 245 (Calcutta Municipal Corporation and Others vs. Shrey Mercantile(P) Ltd. and Others.), paragraphs 18, 20 and 21.

10. On applying multiplier as it transpires from the impugned notices in order to arrive at a sum as demanded from the petitioners towards rates and fees including mutation charges, it has been submitted on behalf of the petitioners that the same is not permissible since the statute is silent on use of multiplier. It is also contended that the demand of the KMC must be reasonable and ought not travel beyond the scope of the relevant statute. In this regard following judgments have been relied upon:-

i) AIR 1989 SC 1642, M/s. Dwarkadas Marfatia & Sons vs. Board of Trustees of the Port of Bombay;

ii) (2004) 3 SCC 214, Jamshed Hormusji Wadia vs. Board of Trustees, Port of Mumbai & Another).

11. Lastly it has been submitted on behalf of the petitioner that in violation of order dated 31st January, 2012 passed on the previous writ petition being W.P.A. 22459 of 2011 the Municipal Commissioner passed order without considering the points taken in the written objection filed before the Commissioner though it was directed vide said order dated 31st January, 2012 that the Commissioner shall consider the points to be taken in the written objection.

12. In addition to the judgments referred to above being relied upon on behalf of the petitioners other judgments relied upon by the petitioners are as follows:-

i) (2006) 4 CHN 499, ABL International Ltd. and Anr. vs. Kolkata Municipal Corporation & Ors., paragraphs 29 and 30;

ii) AIR 1992 SC 2038, Ahmedabad Urban Development Authority vs. Sharad Kumar Jayant Kumar Pasawalla and Others, paragraphs 6 and 7;

iii) (2000) 2 CLJ 161, State of West Bengal vs. M/s. Shrey Marchantile Private Ltd. and Ors.;

iv) (2011) 4 SCC 602, Gangadhara Palo vs. Revenue Divisional Officer & Another.

13. Per contra Mr. Ashoke Kumar Banerjee, learned senior advocate ably assisted by Mr. Biswajit Mukherjee, learned advocate representing KMC submitted that RPH was Sk. Nizam having six stalls covering total area of 3484.25 sq. ft. but on inspection in presence of petitioners’ representative it was found that the restaurant was being operated on a total area of 5313 sq. ft. consisting of excess area of 1594.40 sq. ft. and sub-floor area of 234.35 sq. ft. According to KMC license was granted in favour of RPH in respect of six stalls which were amalgamated into one unit.

14. It is further contended that till date no license is granted in favour of Irshad Alam since death of RPH in 1972. While questioning the right of said Irshad Alam to induct Shelter Projects Pvt. Ltd. into his business of running the said restaurant emphasis is laid on Section 52 of the Easements Act, 1882 which defines “license”. Section 52 of the Easements Act, 1882 is quoted below:-

“52. “License” defined. - Where one person grants to another, or to a definite number of other persons, a right to do, or continue to do, in or upon the immovable property of the grantor, something which would, in the absence of such right, be unlawful, and such right does not amount to an easement or an interest in the property, the right is called a license.”

The purpose of placing reliance on the definition of “License” as ascribed in the aforesaid Act of 1882 is to demonstrate before this Court that the license which was granted in favour of RPH is not transferrable and the act of Irshad Alam to induct Shelter Projects Pvt. Ltd. and to form a private limited company namely M/s. Nizam’s Restaurant Pvt. Ltd. is an inappropriate step which the son of RPH is not authorized to take. According to KMC Nizam’s Restaurant Pvt. Ltd. being a proprietorship firm or a partnership firm is a completely different legal entity. However, an agreement was made by the son of RPH on 15th June, 2007 and subsequently on 19th March, 2009 Nizam’s Restaurant Pvt. Ltd., being the petitioner herein, applied for mutation on enclosing the said agreement dated 15th June, 2007, a copy of the Memorandum of Association and an indemnity bond undertaking that the petitioners would pay the mutation charges and all other dues as per Kolkata Municipal Corporation Rules and Regulations. On 24th March, 2009 another letter was submitted on behalf of the petitioners declaring the area of stall is 3484.25 sq. ft. but agreed to pay any difference in fees in connection with the area of the stall in future in terms of the KMC Rules. The said letter of the petitioners dated 24th March, 2009 is annexed to the supplementary affidavit affirmed on behalf of KMC on 7th July, 2023 at page 30.

15. It is relevant to record herein that up to 31st December, 2005 total outstanding dues against the said restaurant was more than Rs.24,00,000/-and the son of the RPH vide application dated 30th September, 2005 approached the Mayor of KMC that he would pay Rs.5,00,000/-immediately and the rest amount to be paid @ Rs.2,00,000/- per month for realization of outstanding dues. Such proposal which was presented by the son of RPH vide application dated 30th September, 2005 was approved by the Mayor and accordingly, Rs.5,00,000/- was paid on 17th January, 2006 and subsequently on 9th March, 2006, Rs.2,00,000/- was paid. Subsequently, no payment was made thereafter though it was proposed that Rs.2,00,000/-would be paid per month for realization of outstanding dues. On 16th June, 2007 KMC issued demand notice asking for payment of Rs.19,63,958.00/-up to April 2007 for realization of outstanding stallage and electric charges and on receipt of the said notice on 28th June, 2007 son of RPH paid Rs.20,31,614/- towards said demand along with interest. According to KMC this was the last payment made towards stallage and electric charges in respect of the said restaurant.

16. On receipt of the application dated 19th March, 2009 from the petitioners a joint inspection was carried out on 11th September, 2009 to ascertain the excess area utilized by the petitioners in running the said restaurant and it was found that instead of 3484.25 sq. ft. 5313 sq. ft. area was being utilized by the petitioners. Thereafter Superintendent of S.S. Hogg Market vide letter dated 14th January, 2011 intimated the petitioners that the Mayor vide order dated 12th January, 2011 was pleased to approve the prayer which was submitted vide letter dated 29th March, 2009. However, in paragraph 7(a) of the said supplementary affidavit the date of the said letter of the petitioners was described as 19th March, 2009. But it has been categorically submitted on behalf of KMC and it also emanates from the letter dated 14th January, 2011 of the Superintendent, S.S. Hogg Market that such approval is subject to payment of charges relating to mutation, amalgamation, regularization of excess area etc. in connection with six stalls and the petitioners were requested to make payment at an early date failing which interest would be levied on the said outstanding amount. Such letter dated 14th January, 2011 is annexed to the supplementary affidavit, at page 31.

17. After approval of prayer granted in favour of the petitioners by the concerned authority of KMC a demand notice dated 14th January, 2011 was issued by the KMC whereby Rs.2,79,02,453.00/- was demanded towards changing names of licensees, amalgamation of stalls, regularization of excess area, interest and penalty. Subsequently, on reconsideration of the quantum of demand after receipt of objection from the petitioners the amount was reduced to Rs.2,10,56,342.00/- and a demand notice dated 21st November, 2011 was issued asking the petitioners to make payment. On receipt of aforesaid two demand notices a writ petition being W.P.A. No. 22459 of 2011 was filed by the petitioners and the same was disposed of vide order dated 31st January, 2012 directing the Municipal Commissioner of KMC to dispose of the matter after considering the written notes of submissions of the petitioners within certain time by passing a reasoned order.

18. Thereafter there was further re-examination of quantification of demand and the total demanded amount was reduced to Rs.2,05,81,725/-; such demand notice is at page 35 and 36 of the said supplementary affidavit.

19. It has been submitted on behalf of the KMC that while revisiting the quantification of the amount which was demanded from the petitioners though it was found that there was physical amalgamation of six stalls into one unit without formal permission/sanction of the KMC but the KMC waived the charges for amalgamation as a special consideration which is recorded in the impugned order of the Municipal Commissioner being “Annexure P-9” to the writ petition.

20. On behalf of KMC, the argument which was advanced by the petitioners based on Article 265 of the Constitution of India, is disputed on the premise that the demand notice issued to the petitioner is for realization of stallage and other ancillary charges which cannot be equated with tax. It is further submitted that there is difference between tax and rent/fee; in case of rent/fee there is quid pro quo and based on understanding between the parties rent/fee is realized. In this regard attempt has been made to distinguish the decision in Asian Leather (supra). In paragraphs 42 and 45 of Asian Leather (supra) whether the party who deposited the drainage development fee was entitled to recover the same after the relevant circular was declared ultra vires the KMC Act, 1980 and Rules and Regulations framed thereunder, was the issue before the Hon’ble Division Bench. In support of the prayer for recovery of deposited amount judgment of the Apex Court in the case of Sales Tax Officer, Benaras and Ors. vs. Kanhaiya Lal Makund Lal Saraf reported in AIR 1959 SC 135 was relied upon which according to KMC was overruled by the nine Judge Bench of the Supreme Court reported in (1997) 5 SCC 536 (Mafatlal Industries Ltd. and Ors. vs. Union of India and Ors.). It was the contention of the respondents that since Kanhaiya Lal (supra) was overruled by the nine Judge Bench of the Supreme Court in Mafatlal Industries Ltd. (supra) the judgment of the Hon’ble Division Bench in Asian Leather (supra) ought not to have been relied upon by the learned senior counsel representing the petitioners.

21. Another contention which was raised on behalf of the respondents was inapplicability of the judgment of a coordinate Bench in ABL International Ltd. and Anr. vs. Kolkata Municipal Corporation & Ors. reported in (2006) 4 CHN 499; since against the said judgment appeal was preferred by the KMC and the Hon’ble Division Bench vide order dated 17th March, 2010 observed that the judgment and order under appeal shall be of no consequence and the effect and the same was set-aside. The learned counsel representing KMC while placing reliance on the unreported judgment of the Hon’ble Division Bench dated 17th March, 2010 specifically argued that the learned senior advocate representing the petitioners ought not to have relied upon an order of the coordinate Bench passed in ABL International (supra) when the said judgment was set-aside by the Hon’ble Division Bench vide order dated 17th March, 2010 and accordingly it was submitted that there was an attempt on the part of the petitioners to mislead this Hon’ble Court.

22. It is also submitted that slightest departure in facts turns the principle promulgated by the Court inapplicable in the context of relevancy of the ratio decided in Asian Leather (supra) by the Hon’ble Division Bench in the present case; according to the respondent the demand made by the KMC is neither tax nor rent but license fee. In this regard reliance is placed on AIR 2008 SC 690 (State of Rajasthan Vs Ganeshi Lal), paragraphs 14, 15 and 16. In paragraph 14 it has been enunciated by the Apex Court that one additional or different fact may make a world of difference between conclusions in two cases. Therefore, disposal of cases by blindly placing reliance on a decision is not proper. Said ratio is relied upon in order to demonstrate before this Court that the issue decided in Asian Leather (supra) is not akin to the issue being considered by this Court in the present case which centers around demand of license fee, arrear stallage and utilization of excess area for a considerable period of time.

23. By placing reliance on the judgment of the co-ordinate Bench reported in (2003)1CHN 380 (Nepal Chandra Kar & Ors. vs. Calcutta Municipal Corporation & Ors.) it has been contended that the claim of arrear stallage cannot be resisted on the strength of Section 573 of the said Act of 1980 on applying limitation of three years as provided in the proviso therein. Borrowing inspiration from the judgment in Nepal Chandra Kar (supra) and the power conferred upon the concerned authority of KMC in terms of Section 432 of the said Act of 1980 it is submitted that in case of realization of stallage section 573 has no manner of application as it has been decided in the aforesaid case. In addition thereto reliance has also been placed on section 426 and 427 of the said Act of 1980 in order to demonstrate before this Court that specific restraints are imposed on the licensees of stall and slaughter-house in the municipal markets.

24. In order to substantiate the demands made on behalf of KMC towards stallage, mutation, use of excess area and sub-floor area it has been categorically submitted that section 430 of the said Act of 1980 empowers the Municipal Commissioner to charge stallage, rent or fee as may from time to time be fixed by the corporation in this behalf for the occupation or use of any stall, shop, stand, shed or pen in a municipal market or municipal slaughter-house. In furtherance thereto according to the respondents in terms of section 131 while adopting for the ensuing year a budget estimate which shall be the estimate of the receipts and expenditure of the corporation to be received and incurred on account of the municipal government of Kolkata shall state the rates at which various taxes, surcharges, cesses and fees shall be levied by the corporation in the year next following. Sub-section (2) of section 131 indicates different accounts in connection with those accounts the budget estimate shall separately state the income and the expenditure of the corporation to be received and incurred. According to KMC general account as provided under section 131 (2)(e) is the relevant head under which the issue relating to realization of stallage and other fees as demanded by KMC from the petitioners is covered. It was submitted by the learned counsel representing KMC that the demand notice issued to the petitioners claiming recovery of stallage and other charges as delineated in the said notice is not beyond the scheme of the said Act of 1980 and the KMC is authorized by the aforementioned relevant provisions of the said Act of 1980 to claim such stallage and other charges while approving the proposal which was submitted on behalf of the petitioners vide letter dated 19th March, 2009. In this regard reliance was placed on an unreported judgment of a co-ordinate Bench dated 13th May, 2005 passed in WPA 1060 of 2003 (Subhasish Deb vs. Kolkata Municipal Corporation & Ors.) wherein it was held that without permission of the Municipal Commissioner no one is entitled to use a municipal market for selling any animal or article and for the purpose of occupation or use of any stall, the Municipal Commissioner is entitled to charge such fee as may be fixed by the corporation in that behalf. While dismissing the writ petition the co-ordinate Bench observed that schedule of rates prescribed by the Municipal Commissioner is in accordance with the powers conferred under Section 430 of the said Act of 1980 and such authority was not challenged, therefore petitioner was held liable to pay the amount that was charged by the corporation towards change of name. The learned counsel representing KMC made endeavour to distinguish some of the judgments relied upon on behalf of the petitioners.

25. On analysis of chronology of facts, it appears that son of RPH made application on 30th September 2005 to the KMC for payment of outstanding amount towards stallage and electric charges since up to 31st December, 2005 it was found that Rs.24,00,000/- was due. Vide letter dated 30th September, 2005 it was proposed that Rs.5,00,000/- would be paid immediately and the rest of the amount to be paid @ Rs.2,00,000/- per month for clearing the dues up to 31st December, 2005. The request made by the son of RPH vide letter dated 30th September, 2005 was accepted by the KMC, accordingly payment commenced and on 17th January, 2006 Rs.5,00,000/- was paid and subsequently on 9th March, 2006, Rs.2,00,000/- was paid but thereafter as per proposal made in the letter dated 30th September, 2005 no payment was made. Subsequently as per demand notice dated 16th June, 2007 for realization of dues up to April, 2007 on 28th June, 2007 son of RPH paid Rs.20,31,614/- towards outstanding dues along with interest on account of stallage and electric charges. According to KMC this was the last payment made by the son of RPH which is not controverted by the petitioners. Meanwhile on 15th June, 2007 an agreement was made between son of RPH and the third-party forming M/s. Nizam’s Restaurant Pvt. Ltd. based on which on 19th March, 2009 application was made for mutation enclosing an indemnity bond whereby an undertaking was tendered that the petitioners would pay requisite fee and charges. On 24th March, 2009 another letter was submitted by the petitioners intimating the KMC that the restaurant comprised of 3484.25 sq.ft. and if any difference is found relating to the area of the restaurant the petitioners were ready to comply with the requirement. The KMC having received the application of the petitioners dated 19th March, 2009 made a joint inspection on 11th September, 2009 when it was found that instead of 3484.25 sq.ft. being the area allotted to the restaurant comprising of six stalls 5313 sq.ft. was the area of the restaurant and additionally sub-floor area was also utilized comprising of 234.35 sq.ft. Case has been made out by KMC that initially six stalls were allotted to RPH that was amalgamated into one unit without any formal approval. Thereafter in consideration of the application of the petitioners dated 19th March, 2009 on behalf of KMC vide letter dated 14th January, 2011 proposal was approved for induction of third party upon formation of M/s. Nizam’s Restaurant Pvt. Ltd. on payment of charges applicable as per Market Schedule. The letter dated 14th January, 2011 of Superintendent, SS Hog Market is quoted below:

“To,

Mr. Arabinda Mukherjee,

Director,

M/S Nizam’s Restaurant Pvt. Ltd.

23-24 Hogg Street

Kol-700027

Sub:- Demand in connection with Mutation,

Amalgamation, regularization of Excess

Area, etc. in respect of STALL no.-H(P)-

16-17,18-19,23-25,26,26/1 &26/2 of S.S

Hogg Market (Old Complex)

Sir,

With reference to your letter dated 29/03/2009, I am directed to state that Hon’ble Mayor vide his order dated 12/01/2011 has been pleased to approve your prayer.

The demand in connection with charges applicable as per Market Schedule is enclosed herewith for your information.

However, you are requested to make payment at an earliest.

This is also for your information that in case of non-payment of the said demand after expiry of 30(thirty) days from the date of communication, interest @ 2 % per month will be accruded (sic).

Superintendent

S.S Hogg Market”

(emphasis supplied)

26. After issuance of aforesaid letter to the petitioners three demand notices dated 14th January, 2011, 21st November, 2011 and lastly a demand notice which was approved by the Municipal Commissioner on 4th July, 2012 were served upon the petitioners finally demanding Rs.2,05,81,725/-while modifying the demand notice which was issued on 14th January, 2011. The concerned authority of KMC waived amalgamation charge and penalty for amalgamation of stalls which as it appears were levied in the first demand notice.

27. Therefore, it appears that last payment was made on 28th June, 2007 towards arrear stallage and electric charges along with interest till April 2007. On this writ petition an interim order was passed on 4th March, 2013 whereby a coordinate Bench directed the petitioners to deposit Rs.35,00,000/- and the same has been deposited. Apart from the aforesaid payments made by the petitioners no payment has been made towards stallage and other charges.

28. In consideration of the submissions made by the parties and on perusal of relevant records and statutory provisions it appears that contention of KMC is levying of demand based on letter 14th January, 2011 is as per Section 430 and Section 131 of the said Act of 1980. It was contended by the petitioners that as per Section 430 KMC is empowered to levy stallage, rent and fee and the rates of such levy is to be determined under Section 131 but the same does not authorize the KMC to levy under other heads which are not contemplated under Section 430. According to the petitioners identical issue came up before the Hon’ble Division Bench in Asian Leather (supra) and the said judgment was assailed before the Hon’ble Supreme Court in Special Leave to Appeal being Civil No(s). 14443/2007 but the same was dismissed vide order dated 6th August, 2009 refusing to grant special leave. In Asian Leather (supra) the Hon’ble Division Bench was considering the validity of the circular no. 08 of 2002-03 by which provision was made for imposition of Drainage Development Fees while sanctioning the building plan on the anvil of Section 307 and Section 131 of the said Act of 1980. As per Section 307 the Municipal Commissioner is authorized to levy annual fee for drainage and sewerage at the rate to be fixed under the regulations made thereunder or as per budget estimate under Section 131(3) on the owner or occupier or the person responsible to pay property tax on any house or land. It has been clearly discussed and clarified in paragraph 18 of Asian Leather (supra) that if as per Section 307 read with Section 131 provision is made in the budget estimate disclosing the amount to be received and incurred towards drainage account for the ensuing financial year, an annual fee may be levied upon the owner of building or land or the occupier or the person responsible to pay property tax on any house or land but realization of “one time money” as condition precedent for sanction of building plan of a proposed building towards drainage development of the surrounding area or of the adjoining area and laying demand only on those persons seeking sanction of building plan without covering other land owners or the building owners or the person responsible to pay property tax by issuing the said circular no. 08 of 2002-03 was found to be inappropriate by the Hon’ble Division Bench. On juxtaposing the facts of Asian Leather (supra) and the present case it transpires the demand notice of the KMC issued in the present case ought not to be scrutinized in the light of the ratio of Asian Leather (supra) since in that case demand of Drainage Development Fees was clamped upon the persons who sought for sanction of building plan for drainage development of the adjoining area segregating those persons from others who are also responsible to pay property tax since the same was found to be not contemplated under Section 307. In contradistinction to the issue involved in Asian Leather (supra) in the case at my hand demand notice has been issued in terms of Section 430 read with Section 131 towards stallage and change of name/transfer of interest first from RPH to son of RPH and subsequently from son of RPH to third party, regularization of excess area and sub-floor area and penalty. For comprehending the issue this Court finds it apt to quote Section 430 and Section 432 below:-

“430. Levy of stallage, rent and fee.—The Municipal Commissioner may –

(a) charge such stallage, rent or fee as may from time to time be fixed by the Corporation in this behalf –

(i) for the occupation or use of any stall, shop stand, shed or pen in a Municipal Market or municipal slaughter-house;

(ii) for the right to expose articles for sale in a Municipal Market;

(iii) for the use of machines, wiehgts, scales and measures provided for in any Municipal Market; and

(iv) for the right to slaughter animals in any municipal slaughter-house, and for the feed of such animals before they are ready for slaughter; or

(b) farm the stallage, rent or fee chargeable as aforesaid or any portion thereof for such period as he may think fit; or

(c) put up to public auction, or dispose of by private sale, the privilege of occupying or using any stall, shop, stand, shed or pen in a Municipal Market or municipal slaughter-house for such period and on such conditions as he may think fit.

432. Power to expel person contravening regulations.—(1) The Municipal Commissioner may, after giving the parties concerned an opportunity of being heard and in accordance with such regulations as may be made by the Corporation,--

(a) expel from any Municipal Market, municipal slaughter-house or municipal stockyard, for such period as he may think fit, any person who or whose servant has been found contravening any regulations made under this Act and in force in such market, slaughter-house or stockyard,

(b) prevent such person, by himself or by his servant, from further carrying on any trade or business in such market, slaughter-house or stockyard or occupying any stall, shop, standing, shed, pen or other place thereon,

(c) close the stall or shop of the person found to be in default in payment of the stallages or rents or any other dues to the Corporation till payment is made or recovered under the provisions of this Act, and

(d) determine any lease or tenure which such person may have in any such stall, shop, standing, shed, pen or place.

(2) If the tenant or the agent of the tenant of the owner or the lessee of any private market or slaughter-house has been convicted for contravening any regulation made under this Act, the Municipal Commissioner may require such tenant or agent to remove himself from such market or slaughter-house within such time as may be mentioned in the requisition, and if such tenant or agent fails to comply with such requisition, he may, in addition to any penalty which may be imposed on him under this Act, be summarily removed from such premises by the owner or the lessee thereof or by the servant of such owner or lessee.

(3) If it appears to the Municipal Commissioner that in any such case the owner or the lessee is acting in collusion with a tenant or an agent, convicted as aforesaid, who fails to comply with any requisition under sub-section (2), the Municipal Commissioner may, if he thinks fit, cancel the licence of such owner or lessee in respect of such premises.”

(emphasis supplied)

29. Under Section 430(a)(i) it has been provided that the Municipal Commissioner is authorized to charge stallage, rent or fee as may from time to time to be fixed by the corporation for the occupation or use of any stall, shop, stand, shade, or pen in municipal market or municipal slaughter house whereas Section 131 deals with adoption of budget estimate containing estimate of receipts and expenditure of the corporation to be received and incurred on account of municipal government and sub-Section (3) empowers the corporation to prescribe rates at which various taxes, surcharges, cesses and fees shall be levied by the corporation in the next ensuing year by presenting budget estimate. Therefore, conjoint reading of Section 430 and 131 demonstrates that it is within the authority of the KMC to levy stallage, rent and fees as may from time to time to be fixed by the KMC for occupation or use of stall, shop, stand, shade or pen in the municipal market and fixation of rate is to be made on presentation of budget for the next ensuing year wherein income and expenditure of the KMC to be received and incurred on different accounts is to be stated. Section 432(1)(c) provides the steps which can be taken against the licensee in connection with a stall and it has been provided therein that Municipal Commissioner after granting opportunity of being heard may close the stall or shop of those persons found to be in default in payment of stallage or rents or any other dues to the corporation till payment is made or recovered under the provision of the said Act of 1980. Therefore, in consideration of the provision of Section 131, 430 and 432 KMC is found to be authorized to levy stallage, rents or any other dues upon the licensee of a stall in a municipal market at the rate prescribed in schedule of rates, taxes, fees and charges for the relevant year in consonance with Section 131(3). It is also stated in the letter dated 14th January, 2011 of the Superintendent, SS Hogg Market that the petitioners would be requested to make payment at the earliest based on demand in connection with charges applicable as per Market Schedule which appears to be pre-condition to approve the proposal submitted by the petitioners vide letter dated 19th March, 2009 based on the agreement between the son of RPH and the third party dated 15th June, 2007. Accordingly, this Court does not find it to be appropriate to decide the validity of the demand notice issued by the KMC based on ratio in Asian Leather (supra). KMC has made an attempt to substantiate that the ratio of Asian Leather (supra) is inapplicable in view of nine judge Bench of the Hon’ble Supreme Court in Mafatlal Industries (supra) but the said decision has been found to be on the point of recovery of the amount paid and since it has already been discussed hereinabove that the issue involved in the present writ petition is not akin to the point decided in Asian Leather (supra) this Court is not required to dilate on the applicability of the decision of Apex Court in Mafatlal Industries (supra). In the backdrop of the order of the Hon’ble Supreme Court dated 6th August, 2009 on the special leave petition preferred by KMC against the judgment of the Hon’ble Division Bench in Asian Leather (supra) the judgment of the Hon’ble Supreme Court in Gangadhara Palo (supra) was relied upon by the petitioners since the Special Leave to appeal was not granted by the Hon’ble Supreme Court vide order dated 6th August, 2009. Proposition laid down in Gangadhara Palo (supra) is no more a good law in view of the decision in Khoday Distilleries Ltd. & Others reported in (2019) 4 SCC 376 wherein the ratio of Gangadhara Palo was impliedly overruled and the decision in Kunhayammed vs. State of Kerela reported in (2000) 6 SCC 359 was affirmed and followed. However, this Court is not required to discuss further on dismissal of the Special Leave Petition by the order dated 6th August, 2009 preferred against the decision of the Hon’ble Division Bench in Asian Leather (supra) since it has been discussed above that the ratio in Asian Leather (supra) does not apply in the present case in view of different fact situation.

30. In Subhasis Deb (supra) though the coordinate Bench vide order dated 13th May, 2005 refused to interfere with the demand made by the KMC but it has specifically been recorded in the said order that the decision was taken since the authority of KMC under Section 430 to levy demand was not questioned but in Nepal Chandra Kar (supra) in the context of applicability of proviso to Section 573 relating to limitation of three years provided therein for initiation of proceedings for recovery of any sum it has been decided in paragraphs 7 and 8 that Section 573 applies only to the cases of recovery of amount of any charge, cost, expenses, fee, rate, rent or on any other account for which no mode of recovery is provided in the said Act of 1980. But in connection with demand for arrear stallage Section 573 is not applicable in view of the authority provided under Section 432(1)(c) since it has been provided therein that the Municipal Commissioner may close the stall or shop when a person found to be in default in payment of stallage or rents or any other dues to the corporation till payment is made or recovered under the provisions of the said Act of 1980. Therefore, the contention of the petitioners that the authority of KMC is circumscribed by proviso to Section 573 since it has been provided therein that no proceedings to recover the dues can be initiated beyond the period of three years from the date on which the amount becomes due, is inapplicable in the present case since the demand notice was issued against the petitioner towards arrear stallage and other fees. On perusal of the decision in Nepal Chandra Kar (supra) this Court finds that the case of the KMC relating to the demand notice claiming arrear stallage and other related dues, is fortified.

31. In addition thereto the point urged on the strength of proviso to Section 573 that beyond the period of three years in the present case arrear stallage cannot be claimed is misconceive contention since based on application dated 19th March, 2009 proposal to induct third party was approved vide letter dated 14th January, 2011 by the KMC and demand notices were issued on 14th January, 2011 and subsequently on 21st November, 2011. Therefore, within the period of three years from the date of making application by the petitioner on 19th March, 2009 demand was laid by the KMC for payment of stallage and other fees/charges. The aforesaid demand notices were questioned by instituting writ petition being WPA 22459 of 2011 which was disposed of vide order dated 31st January, 2012 directing Municipal Commissioner to take decision by passing reasoned order within four weeks from the date of communication of the said order and in compliance thereof the Municipal Commissioner passed order which is at pages 114 to 117 of the writ petition being “Annexure P-9”. By the order of the Municipal Commissioner the contentions of the petitioners relating to demand notices were negated and the said order of the Municipal Commissioner is questioned in the present writ petition. It has also been contended by the petitioners that the said order of the Municipal Commissioner is untenable since the points urged by the petitioners in their written notes of submissions filed before the Municipal Commissioner were not considered. The Municipal Commissioner in his turn while passing the order decided to waive the charges for amalgamation under special consideration. Still petitioners were aggrieved by the said order of the Municipal Commissioner which triggered the present writ petition and challenge is thrown to the order of the Municipal Commissioner since according to the petitioners all points taken in the written notes of submission filed by the petitioners before the Municipal Commissioner were not considered. The allegation of failure of considering all the points as agitated in the written notes of submission while order was passed by the Municipal Commissioner pales into insignificance since parties have elaborately argued the points available to them before this court. But the desperation revealed while argument was advanced on behalf of the petitioners is deprecated since the judgment of a coordinate Bench in ABL International Ltd. (supra) was relied upon but the same was set-aside by the Hon’ble Division Bench vide order dated 17th March, 2010 with a direction that the judgment of the coordinate Bench passed in ABL International Ltd. (supra) shall not be treated as precedent while deciding the cases, if filed, on similar points, in future and no party shall claim any equity and/or relief on the basis of the judgment and order under the appeals. The relevant part of the order of the Hon’ble Division Bench dated 17th March, 2010 is quoted below:

“ The Judgment and Order under appeals shall be of no consequence and effect and the same stands set aside. It is, however, made clear that since this Court has not examined the points raised by the parties in the respective appeals to decide the correctness and/or validity of the findings of the learned Trial Court, the same issues, if raised in any other case, shall be dealt with afresh and independently without reference to the Judgment and Order under appeals and the concerned Court while dealing with such cases shall not be influenced by the findings/observations and/or conclusions as recorded in the Judgment and Order under appeals. In other words, the Judgment and Order under appeals which is hereby set aside shall not be treated as precedent while deciding the cases, if filed, on similar points, in future and no party shall claim any equity and/or relief on the basis of the Judgment and Order under appeals.”

32. In M/s. Shrey Merchantile (supra) [(2000) 2 CLJ161] the Hon’ble Division Bench was considering whether the KMC in the guise of imposing “fee” in effect is authorized to impose tax without any sanction of law in consideration of Section 170 of the said Act of 1980 whereunder the KMC is empowered to levy taxes in relation to the matters stated therein. The case which is considered now does not have semblance of the aforesaid case in view of authority conferred upon KMC in terms of Section 430 read with Section 131. The principle which has been laid down in M/s. Dwarkadas Marfatia (supra) is inapplicable in the present fact situation since in that case the Apex Court was considering exercises of discretion or power by public authorities like Board of Trustees for the Port of Bombay in respect of dealing with tenants since such authorities have been treated separately and distinctly from other landlords on the assumption that such public authorities would not act as private landlords. The principle of reasonableness on the touchstone of Article 14 was enunciated by the Apex Court in the context of issuance of termination notice against the party who alleged that the premises had been acquired and used for rice mill for 40 years. Similarly, in Jamshed Hormusji (supra) the Apex Court has held that while enjoying exemption from rent control legislation the state or the public authority is not exempted from honoring constitution itself and they continued to be ruled by Article 14 in the backdrop of dealing with the lessee under such authorities including their eviction. The Apex Court laid emphasis on reasonableness of the state or the instrumentalities of the state while enjoying exemption from rent control legislation. Reasonableness which needs to be reflected from the acts and actions of the state authorities was envisaged in the context of evicting the lessee/tenants but in the present case KMC has made a demand which the authority is empowered under the relevant provisions of the statute. The judgment of the Hon’ble Division Bench in Sahujain Charitable Society (supra) deals with facts which do not resemble the present fact situation. The Hon’ble Division Bench while applying the limitation as contained under Section 573 of the said Act of 1980 by reading down the relevant provisions under Section 179(2) made the said provisions reasonable and has restrained the KMC to make assessment for the period which goes beyond the period of limitation in terms of proviso to Section 573. But in the case at my hand demand has been raised by the KMC for realization of stallage which is permissible in terms of Section 430 read with Section 131 in view of the specific powers conferred on the KMC as per Section 426, Section 427 and Section 432.

33. Schedule of rates, taxes, fees and charges of the relevant year is relatable to Section 131(3) of the said Act of 1980. In the said Schedule the methodology of calculation of stallage in connection with stall in municipal market, fee/charge for transfer of interest/change of name of third party, fee/charge for regularization of excess area, fee/charge for regularization of sub-floor area are provided in details. On perusal of notice demanding Rs.2,05,81,725/- which is at pages 35 and 36 of the supplementary affidavit affirmed on 7th July, 2023 it appears that on application of the methodology as contained in Schedule of rates, taxes, fees and charges calculations have been made by the KMC while arriving at the aforesaid sum which is required to be paid by the petitioners in terms of the letter dated 14th January, 2011 of superintendent, SS Hog Market. Nothing is shown from records available that applying wrong methodology charges/fees are levied excepting stray argument is made on behalf of the petitioners that multiplier cannot be applied and such demand is unreasonable.

34. However, on perusal of the final demand notice which is at pages 35 and 36 of the supplementary affidavit filed on behalf of the KMC it appears penalty/fine for transfer of interest without prior approval to the tune of Rs.17,28,000/- has been levied upon the petitioners. In view of approval accorded by KMC vide letter dated 14th January, 2011, being post facto approval, the said penalty/fine for transfer of interest need not be paid by the petitioners and KMC is restrained from recovering the penalty/fine against serial no. 5 as contained in the demand notice which was approved by the Municipal Commissioner on 4th July, 2012.

35. By interim order dated 4th March, 2013 the coordinate Bench directed the petitioners to deposit Rs.35,00,000/- which since has been deposited by the petitioners the said sum of Rs.35,00,000/- shall be adjusted while recovering dues from the petitioners in terms of the demand notice which was approved by the Municipal Commissioner on 4th July, 2012. However, the interim order of the coordinate Bench dated 4th March, 2013 stands vacated. The concerned authority of KMC shall be at liberty to recover the dues as indicated in the demand notice approved by the Municipal Commissioner on 4th July, 2012 whereby claim has been laid to the tune of Rs.2,05,81,725/- excluding penalty as indicated hereinabove.

36. With the aforesaid observations and directions the writ petition stands disposed of and there shall be no order as to costs.

37. Urgent photostat certified copy of this order, if applied for, shall be supplied to the parties expeditiously.

From The Blog
Madras High Court to Hear School’s Plea Against State Objection to RSS Camp on Campus
Feb
07
2026

Court News

Madras High Court to Hear School’s Plea Against State Objection to RSS Camp on Campus
Read More
Delhi High Court Quashes Ban on Medical Students’ Inter-College Migration, Calls Rule Arbitrary
Feb
07
2026

Court News

Delhi High Court Quashes Ban on Medical Students’ Inter-College Migration, Calls Rule Arbitrary
Read More